EIGHT YEARS, ONE VISION: Mayor Steve Hamilton and the Making of Modern Tega Cay

A 1999 video interview with Tega Cay’s longest-serving mayor reveals the trails, ball fields, streets, parks, and development agreements that shaped the city residents know today, told by the man who negotiated all of it.


Stephen Hamilton served Tega Cay longer than any other mayor in the city’s history. He joined the city council in 1990, was elected mayor in 1994, and served in that role until 2002, spanning the city’s most transformative era of physical growth and institutional development. By the time Phil Glennon sat down with him in the spring of 1999, Hamilton was right in the middle of it all, overseeing the Newland Carolina development of 550 acres, a new walking trail, a renovated park, a million dollars in street repaving, and an 8-to-1 public vote to bring the water system under city ownership.

The interview is one of the most project-rich in the entire Glennon archive. Hamilton speaks with the precision of someone who has spent years in rooms where decisions get made, tracking budgets, negotiating with developers, and lobbying for federal transportation funds. His account of what was built during his tenure connects directly to the parks, trails, and streets that Tega Cay residents use every single day.

From Council Member to Mayor. The Developer Years

Hamilton joined the Tega Cay City Council in 1990, during the administration of Mayor Ed Weaver. The developers at the time were Dr. Leon Levitzky and Ed Opel. Two issues defined that early period on council: the aftermath of Hurricane Hugo in 1989 and how to finance its damage, and the sale of Tega Cay’s water system.

The water system sale was a source of genuine frustration for Hamilton. Levitzky owned the system and sold it to Carolina Utilities Inc., a private contractor. Hamilton and fellow council member Steve Forest tried to stop the sale. They were unsuccessful. The water system passed out of the developer’s hands into private ownership, setting up a battle over rates and control that would define one of Hamilton’s key priorities as mayor years later.

Levitzky and Opel were eventually succeeded by Steve Mudge, who led development from roughly 1994 to 1996. In 1997, Newland Carolina arrived and purchased the remaining 550 undeveloped acres on the south side of Tega Cay Drive. That transition, and the development agreement Hamilton negotiated with Newland, would become the defining infrastructure story of his mayoral tenure.

The Walking Trail. A Mile and a Half and $230,000

From his earliest days on council, Hamilton had two recreational projects in mind: a ball field on Water Trace and a pedestrian pathway along Tega Cay Drive. Getting both required owning the land underneath them, and getting the land required the right developer to say yes.

Steve Mudge’s group was willing to donate both properties but attached strings to the arrangement that made negotiations unworkable. When Newland Carolina arrived in 1997, Hamilton went straight to Newland president Steve Corboy with the same proposal. Corboy was receptive. Within six to eight months, the city owned both parcels.

The pedestrian pathway ran along approximately a mile and a half of the south side of Tega Cay Drive, within a 50-foot right of way where no developer could build. The path was eight feet wide and extended from the clubhouse all the way to the city entrance. The total cost was approximately $230,000, most of it funded through RFATS, the Rock Hill Fort Mill Area Transportation Study, which distributed federal transportation funds to regional projects. As mayor, Hamilton was a voting member of RFATS. He lobbied for the funds and secured them.

“From the very beginning, I started calling it the pedestrian pathway so that as we tried to sell the idea, we were always promoting that we were going to be moving people via walking. And that was a successful way to go about obtaining the funds.”

Steve Hamilton, Phil Glennon Video Interview, 1999

That path, now paved and formally named the Stephen M. Hamilton Walking Trail in his honor, runs along Tega Cay Drive past the golf course and through forested areas. It is listed on AllTrails and used by walkers, joggers, and stroller-pushing parents every day. The deliberate choice to call it a pedestrian pathway from day one, rather than a multi-use trail, was not just a naming preference. It was the strategy that unlocked the federal funding that built it.

Water Trace Ball Field. Eleven Acres and Twenty-Five Years of Savings

The second project Hamilton had been working toward since his council days was a ball field at Water Trace. Getting the land from Newland was the same negotiation that produced the walking trail parcel. But the money to develop it had been accumulating for years before that.

Hamilton and the council had been setting aside approximately $25,000 per year specifically for a ball field. By the time the land transfer came through, those funds were ready to deploy immediately. The eleven-acre Water Trace parcel had significant limitations though. Only about six and a half of those acres were usable. The rest dropped off into steep terrain at the back of the property. The city began grading and filling to maximize the buildable area.

In one of the more resourceful moves of Hamilton’s tenure, the dirt excavated from the Windjammer Park erosion control project was hauled directly to Water Trace rather than being disposed of elsewhere. The city saved approximately $13,000 in fill material costs by connecting the two projects. The ball field and the park renovation effectively subsidized each other.

Windjammer Park. From Eroding Cliff to Amphitheater

Windjammer Park had always been one of Tega Cay’s most loved assets. But at its upper end, a sheer drop of thirty to thirty-five feet had made a significant portion of the park both dangerous and unusable for years. Trees were falling. Erosion was taking land. If nothing was done, the city stood to lose a meaningful piece of the park permanently.

Working with the city engineers and the Beautification Committee, Hamilton’s administration developed a plan to terrace down the entire end of the park, removing approximately twenty-five trees in the process to allow a series of graded terraces to step down to the water level. At the center of the terraced area, the city built a small platform stage and structured the surrounding landscape as a natural amphitheater.

“We probably recovered about a half an acre of additional land to that park, incorporating an amphitheater into it along with the benefits of the erosion control.”

Steve Hamilton, Phil Glennon Video Interview, 1999

The result was a net gain of roughly half an acre of usable park land, a solved erosion problem, and a beautiful lakeside performance space. Today, the Carolina Show Ski Team performs free shows at Windjammer Park every Friday evening during the summer. That amphitheater setup owes its existence to a decision Hamilton’s administration made to stop losing ground and start building something better.

Nineteen Streets and a Million Dollar Bond. Repaving the City

Street repaving had been a priority since Mayor Ed Weaver’s administration. Hamilton continued and expanded that work. During his tenure, approximately nineteen streets were repaved across the city at a total cost of about one million dollars, financed through a bond the city was actively repaying at the time of the 1999 interview.

Hamilton’s administration added a requirement that changed the look of Tega Cay’s streetscape permanently. Every street repaved within the city had to include curb and guttering. The policy served two purposes: it created a consistent visual character throughout the city as residents drove from neighborhood to neighborhood, and it gave engineers control over stormwater runoff, funneling rain to drainage areas rather than letting it spread across properties and yards. Drainage had been a chronic problem in Tega Cay’s older sections. The curb and gutter requirement was designed to ensure the newer areas never developed the same issues.

The Newland Development Agreement. Holding a Developer Accountable

When Newland Carolina arrived in 1997 to develop the 550-acre southern tract, Hamilton was determined to avoid the pattern of broken promises that had defined Tega Cay’s earlier developer relationships. The solution was a formal development agreement, a legal document that spelled out exactly what the developer would do and what the city would do, with no ambiguity about obligations on either side.

The agreement covered the development of the 550 acres in four phases over ten years. It included the addition of nine new holes to the golf course, a pool and cabana beach complex around the second marina, and a network of new trails and trailheads that would tie the entire city together with the existing pedestrian pathway. It also contained an extensive tree replacement program. Every lot built had to have between six and thirteen trees replanted depending on lot size. On top of that, the agreement committed $1.5 million specifically toward tree replacement in high-visibility areas including entrance corridors and treescapes throughout the development.

“We wanted to make sure that the promises that were being made were going to be kept. So we put together a development agreement which in essence lays out what the developer is going to do and what the city is going to do, so there are no questions or problems that can’t be addressed within the development agreement.”

Steve Hamilton, Phil Glennon Video Interview, 1999

When Newland’s construction crews began mass grading in October 1998, the scale of the clearing operation generated smoke and ash from debris fires that caused real problems for nearby residents. DHEC issued a notice of violation to Newland for the burning. Hamilton’s administration tightened the burning requirements and began monitoring the development closely on a case-by-case basis. The development agreement had permitted mass grading. Enforcing it precisely was now the city’s job.

The Water Referendum. 8 to 1 for City Ownership

One of the issues that had frustrated Hamilton since his council days was the cost of water for Tega Cay residents. The city bought its water from York County, which bought it from Fort Mill, which bought it from Rock Hill. Each entity added its margin along the chain. By the time the water reached Tega Cay residents, the price was, in Hamilton’s word, exorbitant.

In 1997, Hamilton put the question directly to the voters: should the city get into the water and sewer business? The referendum passed with approximately 8-to-1 support. With that mandate, the city began negotiating with Carolina Water and York County to acquire the utility system. At the time of the 1999 interview, those negotiations were still in progress. The city’s eventual purchase of Carolina Water Service in 2014 under Mayor George Sheppard completed the process Hamilton had set in motion more than fifteen years earlier.

The John Wortley Tennis Complex, the Solicitor, and the Fire Station

Beyond the major infrastructure projects, Hamilton’s tenure produced several smaller but lasting improvements to the city’s facilities and government operations.

The city’s four lower tennis courts had not been resurfaced in twenty years. Hamilton’s administration spent approximately $60,000 to completely tear out and rebuild them. In recognition of longtime Tega Cay resident and tennis enthusiast John Wortley, the courts were renamed the John Wortley Tennis Complex. An annual tennis tournament bearing Wortley’s name was established to build a scholarship fund for local tennis players.

On the administrative side, Hamilton recognized a persistent problem in the municipal court: police officers were presenting their own cases to Judge Grady McMahan, and prosecutions were sometimes failing on technicalities because officers were not attorneys. The solution was to hire Brian Wilson, a local attorney, as the city’s first solicitor. Wilson attended every court session, worked alongside officers on case presentation, and tightened the city’s court operation significantly.

With Newland’s development ramping up, Hamilton also reinstated the position of code enforcement officer, hiring John Dett for the role and later adding Chris Larson as an assistant to keep pace with the volume of new construction activity.

On the public safety front, the volunteer fire department had been asking for more space and better training facilities for years. When the city made its final payment on a major fire truck, freeing up approximately $35,000 per year, Hamilton directed those funds toward a renovation and expansion of the fire station rather than simply removing them from the fire department’s allocation. The result was a new facade, renovated interior, and an additional bay for equipment.

Mayor Steve Hamilton’s Key Accomplishments. 1994 to 2002

ProjectDetailLegacy
Stephen M. Hamilton Walking Trail1.5-mile paved path along south side of Tega Cay Drive; $230,000 funded through federal RFATS transportation fundsNamed in his honor; still actively used daily and listed on AllTrails
Water Trace Ball Field11 acres acquired from Newland Carolina; developed using $25,000/year savings accumulated over yearsBecame part of the Catawba Park complex; dirt from Windjammer saved $13,000 in fill costs
Windjammer Park AmphitheaterEroding 30-35 ft cliff terraced down; 25 trees removed; half-acre of land recovered; stage and amphitheater builtHome of the Carolina Show Ski Team’s free Friday evening summer shows
Street Repaving Program19 streets repaved; $1 million bond; curb and guttering required on every new streetStandardized streetscape and stormwater control throughout the city
Newland Development AgreementFormal legal agreement covering 550-acre Lakeshore development in 4 phases; included 27-hole golf, beach club, trails, and $1.5M tree replacement programFoundation of all Lakeshore development commitments; held developer legally accountable
Water Referendum1997 vote passed 8-to-1 in favor of city water ownership; negotiations with Carolina Water begunSet in motion the process completed with the 2014 Carolina Water Service purchase
John Wortley Tennis Complex4 courts fully rebuilt at $60,000; named for longtime resident; annual scholarship tournament establishedAnnual John Wortley Tennis Tournament scholarship fund continues
City Solicitor establishedHired Brian Wilson as first solicitor to present cases in municipal courtImproved prosecution record; reduced losses on technicalities
Code Enforcement reinstatedHired John Dett and later Chris Larson as Newland development ramped upManaged erosion, burning violations, and building code compliance during peak growth
Fire Station expansionRedirected $35,000/year truck payment toward new facade, renovation, and additional equipment bayUpgraded volunteer fire department facilities to meet growing city needs

The Trail With His Name on It

Steve Hamilton served Tega Cay for twelve years in elected office, eight of them as mayor. He presided over the arrival of Newland Carolina, negotiated the development agreement that governed the Lakeshore build-out, secured federal funds to build the walking trail, acquired the ball field land, renovated Windjammer Park, repaved nineteen streets, launched the water ownership movement, and modernized the city’s court and code enforcement operations.

The trail named for him runs past the golf course he helped protect, along the road he helped repave, through the city he helped build. Every resident who walks it is, in a small way, retracing the work of a mayor who spent eight years turning a good community into a better one.

Watch the Full Interview

The complete Steve Hamilton interview is part of the Phil Glennon 1999 History of Tega Cay Video Series, digitized and hosted on our Videos page. Watch Mayor Hamilton walk through the walking trail negotiations, the Windjammer Park renovation, the Newland development agreement, and the water referendum, in his own words and with the detail only someone who lived it can provide.

Did you live in Tega Cay during the Hamilton years, walk the trail before it had his name on it, or remember the Windjammer Park renovation? We would love to hear your memories. Share your story in the Tega Cay History Facebook Group or contact us here.

Tags: Steve Hamilton, Stephen Hamilton, Tega Cay mayor history, Stephen M. Hamilton Walking Trail, Windjammer Park amphitheater, Water Trace ball field, Tega Cay Newland Carolina development agreement, Tega Cay water referendum 1997, John Wortley Tennis Complex, Phil Glennon video series, Tega Cay government history, Lakeshore development Tega Cay, Tega Cay street repaving

See where this story fits in the Tega Cay History Complete Timeline.


Discover more from Tega Cay Historical Society

Subscribe to get the latest posts sent to your email.

Scroll to Top