In early 1977, Tega Cay was in the middle of a building boom. Two dozen homes were under construction, families were moving in on golf-course lots, and the community newsletter was printing headlines like “Boom Times At Tega Cay.” By the summer of 1978, the building had stopped. What changed in those eighteen months is a story about a national economic crisis that played out, lot by lot and mortgage by mortgage, in a lakeside community on the South Carolina side of Lake Wylie.
Tega Cay Currents was the community newsletter that succeeded the Polynesian Reporter in the mid-1970s, and its issues from 1977 and 1978 offer one of the most dramatic before-and-after portraits in Tega Cay’s archive. Read in sequence, the March 1977 and April 1977 issues describe a community at full throttle. The June 1978 issue describes the same community shutting the engine off.
February 1977: Two Dozen Homes Going Up at Once
The March 1977 issue of Tega Cay Currents opened with a front-page story headlined “Growth At Tega Cay,” accompanied by a photo by Dick McGrew. As of the end of February 1977, roughly two dozen new homes were under construction across the community. Two of them were nearing completion on Tulagi Court. That count didn’t even include Daybreak, the condominium development that was under its own separate construction program.

The scale of that activity is easy to underestimate today. Two dozen homes simultaneously under construction across a single planned community meant work crews, lumber deliveries, foundation pours, and framing going on at multiple sites every day of the week. For a community the size of Tega Cay in 1977, it was a genuine boom — the kind of thing that made the developer optimistic about the year ahead.
Spring Moving Day: “Boom Times At Tega Cay”
A month later, the April 1977 issue put it even more plainly. The front page carried the headline “Boom Times At Tega Cay” above a photograph of the Bennie Cook family on moving day, the kind of image that says everything without a caption: a family arriving at their new home on a golf-course lot, one of dozens of families who moved into Tega Cay that spring. The photo credit again went to Dick McGrew, who had become the community’s de facto visual chronicler.

For the people behind those moving trucks, Tega Cay in 1977 was exactly what it had been advertised as: a Polynesian-themed lakeside resort community where you could buy a home, walk to the clubhouse, and have the golf course practically in your backyard. The developer, Tega Cay Associates, had built it, was building more of it, and by the spring of 1977, the community’s own newsletter was celebrating the momentum with the most unambiguous headline it could write.
June 1978: “There’ll Be Some Changes At Tega Cay”
Fourteen months after “Boom Times At Tega Cay,” the June 1978 issue of Tega Cay Currents ran a very different kind of front-page story — except it wasn’t on the front page at all. It was on page four, under a headline that was careful and measured in a way that “Boom Times” hadn’t needed to be: “There’ll Be Some Changes At Tega Cay.”

The article carried the byline of Roy Cawley, Vice President of Tega Cay Associates. Cawley gave the community three reasons why Tega Cay Associates was exiting the home-building business, stated plainly and without apology.
The first was the savings and loan industry’s “severe shortage of mortgage funds” — a crisis that had run through the end of 1977 and into 1978, as S&L institutions found themselves squeezed between what they could borrow and what they could lend. The second was South Carolina’s usury law, which Cawley said made new-home financing “prohibitively risky” for any lender who wanted to do business in the state. The third was a forecast: Tega Cay Associates, Cawley wrote, “expects the home construction business to run through a severe crisis.”
Then came the five-point plan. Tega Cay Associates would: phase out construction entirely; continue running the community’s amenities program; sell remaining lots to independent builders, while pulling back on marketing; cut the permanent workforce from 75 employees to between 25 and 28; and, as Cawley put it with a phrase that has aged into a kind of period artifact, “sit back and wait on the economy to turn.”
“Sit back and wait on the economy to turn.”
Roy Cawley, Vice President, Tega Cay Associates, Tega Cay Currents, June 1978
The Economics Behind the Decision
The specifics of South Carolina’s usury law are worth understanding, because they explain why Cawley didn’t describe the situation as temporary or fixable — he described it as a structural problem. State law set a ceiling on mortgage interest rates for home loans, and that ceiling had been written for an era when interest rates were much lower than they were in the late 1970s. By 1978, savings institutions were paying roughly 9.882 percent interest on deposits — but the usury law capped what they could charge on mortgages at 10.25 or 10.5 percent for most loans. The spread between those two numbers was razor-thin, and the risk of holding a mortgage for any length of time made the math worse: if a lender sold a mortgage to a federal agency and then couldn’t resell it within thirteen months, the law required the rate to roll back to nine percent. At that point, the lender was paying more on deposits than it was earning on the loan.
For a home builder like Tega Cay Associates, this wasn’t an abstract policy problem. No mortgage meant no sale. No sale meant no reason to build. And so Tega Cay Associates stopped building.
What the Phase-Out Meant, Specifically
The Cawley article spelled out what the five-point plan meant in concrete terms for specific parts of the community. The Downs, a planned development of 86 residences that had not yet broken ground, was shelved indefinitely. No start date was determined. Daybreak, the condominium complex that had been under active construction just a year before, had three buildings still in progress at the time of the announcement; those would be completed, providing homes for approximately ten families. After that, no new Daybreak construction would begin. Cove Village would continue on a limited basis through private contractors, but the developer’s direct involvement there was winding down as well.
On the personnel side, the cut from 75 employees to 25 or 28 was significant — a reduction of roughly two-thirds of the permanent workforce. Cawley himself returned to Atlanta to handle duties for Tega Cay Associates’ parent company. Tim Ledbetter, who had been filling in as interim manager for several months, formally assumed the General Manager role.
Private Builders Step In
The same June 1978 issue that carried Cawley’s announcement also ran, on a later page, a builder directory advertisement for Tega Cay — a full listing of eleven private builders now actively constructing homes on lots throughout the community: Associate Builders, Mumford Construction, Century Home Builders, Fort Mill Builders, Kingsberry Homes, Marx Construction Co., Poag Construction Co., Stowe Builders, Taylor Built Home, Tega Cay Associates (still selling lots and completing existing projects), and Winstead Construction. The juxtaposition of those two items — the developer’s exit announcement and the private builders’ directory — in a single issue captures the transition in a single glance.

Tega Cay Associates wasn’t abandoning the community. The amenities — the golf course, clubhouse, marina, tennis courts, and pool — would continue to be operated and maintained. The lots were still for sale. The community was still growing. But the era of Tega Cay Associates building the homes itself was over, replaced by an open market of independent builders who would take those lots and develop them on their own terms.
A National Story, Told Locally
The late 1970s were difficult years for residential construction across the United States. The savings and loan crisis that Cawley described in his June 1978 announcement would only deepen as the decade ended and the next one began — a structural problem in the American housing finance system that eventually required a federal bailout of the entire S&L industry in the 1980s. Tega Cay wasn’t unique in feeling the pressure. What makes its story worth telling is the specificity: this is what that national story looked like from the inside of one particular community, described in real time by the vice president of the company that had built it from the ground up.
In March 1977, Dick McGrew photographed a building boom. In April 1977, he photographed a family moving day. In June 1978, Roy Cawley wrote four measured paragraphs about why the construction was stopping, and a community newsletter printed them alongside an ad for eleven builders ready to continue what the developer had started. The economy would eventually turn. Tega Cay would keep growing. But the community that exists today was shaped in part by what happened in those eighteen months between “Boom Times” and “sit back and wait” — and the Tega Cay Currents archive is where you can read it for yourself.
Sources: Tega Cay Currents, March 1977 (“Growth At Tega Cay,” p. 1); April 1977 (“Boom Times At Tega Cay,” p. 1); June 1978 (“There’ll Be Some Changes At Tega Cay,” p. 4, Roy Cawley; builder directory, p. 6). Photos: Dick McGrew. All issues from the Tega Cay Currents Archive, Tega Cay History Docs.
TAGS: Tega Cay Associates, Roy Cawley, Tim Ledbetter, Daybreak condominiums, The Downs, Tega Cay Currents, Tega Cay history, building boom, 1970s housing crisis, SC usury law, savings and loan crisis, Tega Cay 1977, Tega Cay 1978, Dick McGrew, home construction, Tega Cay development history
Did you move into Tega Cay during the 1977 building boom, or do you remember the changes that followed in 1978? We’d love to hear your memories of those years. Share them in the Tega Cay History Facebook Group or reach out through our Contact page.
See where this story fits in the Tega Cay History Complete Timeline.
TegaCayHistory.com | Preserving the Good Life for Future Generations
Discover more from Tega Cay Historical Society
Subscribe to get the latest posts sent to your email.